Risk Assessment and Impact Modeling 5
JD

Risk Assessment and Impact Modeling

Workspace 4
Presentation Mode: this workspace demonstrates RAT-aligned impact modeling outputs and does not run live model execution.
Hazard + Exposure + Vulnerability = Impact Forecast
Operational Window
Jun 03, 2026 06:00 AM to 06:00 PM
Model Confidence
High
Impact Map
Hazard Layer
Flood
Exposure Layer
Buildings Population Hospitals
Vulnerability Layer
Sector Curve Weight
Residential Depth-Damage v2.1 0.42
Health Facilities Critical Service Disruption Curve 0.33
Transport Road Inundation Fragility Curve 0.25
Expected Impact
SEVERE
Buildings Affected
12500
Population Affected
42000
Road Segments
28
Hospitals
4
Model Run: RAT-RUN-2026-0612
Hazard Window: Jun 02-03, 2026
Area: Cagayan River Basin
Updated: Jun 02, 2026 10:20 AM
Municipal Impact Breakdown
Municipality Population Buildings Critical Sites Risk
Tuguegarao City 18,500 5,120 2 hospitals, 8 schools Severe
Enrile 7,900 2,340 1 RHU, 4 schools High
Solana 8,100 2,510 1 district hospital High
Iguig 4,700 1,420 3 schools Moderate
Trigger Matrix
Trigger Threshold Status
River level exceeds alarm threshold > 10.0 m Triggered
3H rainfall accumulation > 65 mm Triggered
Road passability disruption > 20 segments Monitoring
Hospital access interruption > 2 facilities Monitoring
Run Activity Log
[10:21] IBF workspace loaded. [10:21] Awaiting simulation run.
Response Protocols
  1. Activate LGU Incident Command System and emergency communication tree.
  2. Issue pre-emptive evacuation advisory for low-lying barangays.
  3. Prioritize hospital and emergency route accessibility monitoring.
  4. Coordinate DSWD and OCD staging for relief and transport assets.
Resource Staging
Resource Planned Deployed Status
Rescue boats 14 9 Mobilizing
High-clearance vehicles 10 7 Mobilizing
Evacuation centers 18 13 Operational
Medical teams 6 4 On standby
Workflow and Outputs
Data Validation
Hazard Overlay
Exposure Intersect
Vulnerability Weighting
Impact Forecast Draft

Latest Outputs
IBF Advisory Draft
Jun 03, 2026 10:22 AM
Ready for Review
Impact Table (Municipal)
Jun 03, 2026 10:19 AM
Generated
Resource Trigger Sheet
Jun 03, 2026 10:17 AM
Generated